top of page
This 4,500' driveway was completed in a little over three weeks near Waxhaw, North Carolina. A dirt pit was excavated and later leveled near the back of the property to provide dirt to build up the driveway. Concrete pipe was installed in two places along the driveway to meet NCDOT requirements. Ditches were cut and the road was fine graded Finally, gravel was laid, and grass was planted on the side slopes. The customer now has a driveway he and his family will utilize for years to come.
Driveway Install
bottom of page